Focus Areas SelectAdvanced / Additive ManufacturingBusiness IT and AnalyticsCBM+ / Predictive MaintenanceCoatings and Corrosion PreventionEnergy, Environmental, Health, and SafetyEnhanced InspectionReliability Improvement (hardware)Workforce Development / VisualizationOther Benefits SelectCost savingsDurabilityEnergy efficiencyImproved readinessLightweightingMaintenance avoidance and reliabilityMaintenance mgmt. improvementObsolescence mgmt. and cont’d maintenance capabilityPositive environmental impactReliability improvementRepair turn-around timeSafetySurvivability Service Branch SelectAir ForceArmyCoast GuardMarine CorpNavyOffice of the Secretary of Defense (OSD) Final Report Available Select to view projects with public final reports Search Project Title Status Innovative Carbon Fiber and Graphitic Foam Solutions – Phase II Active Innovative Radiator Material Durability and Sustainment Active Innovative Small Form Factor Auxiliary Power Units Active Innovative Small Form Factor Auxiliary Power Units – Phase II Active Inspection and Fractographic Analysis to Develop a Digital Twin for a Legacy Aircraft – Phase II Active Inspection and Fractographic Analysis to Develop a Digital Twin for a Legacy Aircraft – Phase IV Active Inspection and Fractographic Analysis to Develop a Digital Twin for a Legacy Aircraft – Phase V Active Inspection and Fractographic Analysis to Develop a Digital Twin for B1 Aircraft Active Inspection and Fractographic Analysis to Develop a Digital Twin for Legacy Aircraft – Phase III Active Inspection and Repair Preparation Cell (IRPC) Complete Integrated Common Software Library (CSL) for Maintenance Training Active Integrated Communications Systems for Improved Logistics Activity Active Integrated Corrosion System Complete Integrated Program Planning Process (IP3) Active Integrated Program Planning Process (IP3) – Phase II Active Integrating 3D Technical Data Packages (TDPs) into a Product Lifecycle Management (PLM) Environment Complete Integrating Sensors and Predictive Maintenance Systems with Performance Support Technology to Achieve Increased CH-53E Readiness and Reliability – Phase I & II Complete Integration and Sustainment Strategy Complete Integration of Laser Coating Removal Systems Complete Integration of Locally Derived Model Based System Engineering Tools to Enterprise Product Lifecycle Management Systems Active Integration of Operational Energy into Training and Education Complete Integration of Repair Data Active Intelligent Management Analysis System (IMAS) Complete Interactive Visualization Complete Intermittent Fault Detection & Isolation System (IFDIS) Complete Intermittent Fault Detection Technology Implementation and Training for Naval Surface Warfare Center Crane Division – Phase II Complete, Featured Intermittent Fault Detection Technology Implementation and Training for Naval Surface Warfare Center Crane Division – Phase III in support of LRU/WRAs Demonstration and Evaluation for Intermittent Fault Detection (IFD) Implementation Depot Level Maintenance Complete Intermittent Fault Detection Technology Pilot Implementation for U.S. Air Force (USAF)/Air Force Material Command (AFMC) Active Intermittent Fault Detection Technology Pilot Implementation for U.S. Air Force (USAF)/Air Force Materiel Command (AFMC) Complete Isotropically Conductive Adhesive (ICA) Complete Item Master Logistics Capability Initiative – Phase II Complete IUID Data Utilization Strategy and Policy Initiative for Sense & Respond Logistics (S&RL)/Total Lifecycle Management (TLCM) Complete IUID Enabled Workscope Optimization Complete, Featured IUID Marking for Legacy Parts Complete IUID Marking for Legacy Parts – Navy Pilot Complete JIT Business Case Analysis and Analysis of Alternatives Complete Joint Additive Manufacturing Acceptability (JAMA) Active Joint Field Service Evaluation Plan (Common Vendor) Complete Joint Intermittence Testing (JIT) Capability Complete Joint Intermittence Testing (JIT) Capability – Phase II Complete Joint Intermittence Testing (JIT) Capability Joint Maintenance Data Enterprise Interoperability (JMDEI) – Phase I Complete Joint Maintenance Data Enterprise Interoperability – Phase II Complete Joint Maintenance Data Enterprise Interoperability – Phase III Complete Joint Maintenance Enterprise Interoperability Complete Joint Test Protocol for Gas Turbine Engine Materials Complete Kinetic Spray Metal Deposition Complete Large Standoff, Large-Area Thermography (LASLAT) Non-Destructive Inspection of Composite Structures Complete, Featured Laser Coating Removal – Phase II Complete Laser Engineered Net Shaping (LENS) II Complete Laser Engineering Net Shaping Solutions (LENS) for Commercial and Defense Manufacturing Repair and Overhaul Applications – Phase I Complete First12345678910111213Last