• ABOUT
  • CONTACT
Menu
  • Collaborations
    • AMMP

      AMMP Home
      About
      Resources
      Membership
      Contact

      CTMA

      CTMA Home
      About 
      News
      Opportunities
      Projects
      Partners
      Contact

      CyManII

      Overview

      Environmental Programs

      Home
      About
      Partners
      Contact

  • News
    • News
      CTMA Magazine
      CTMA Connector
      Technology Briefs
      Opportunities
      Project Announcements
      News Archive

      RECENT HEADLINES

      NCMS Chief Technology Officer Appointed to Navy’s Science and Technology Board

      US Army's Inaugural Contested Logistics Industry Week Scheduled for September

      First NCMS Technology Showcase at Tinker AFB Shines Spotlight on Innovative Solutions

      Accelerating Technology Transition: NCMS Expands its Impact

      CTMA Delivers Technology Transition Success Stories

  • Events
    • Upcoming Events

      12/18/2023 - 12/21/2023
      2023 DoD Maintenance Symposium

      01/16/2024 - 01/18/2024
      NCMS Technology Showcase: Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNS & IMF)

      View all events

  • Membership
    • NCMS Membership

      Membership Overview


Commercial Technologies for Maintenance Activities
Home | About | News | Opportunities | Events | Projects | Partners |  Contact

 

 

Project Title Status
Adoption of Emerging Sustainment Technologies – Phase III Complete
Adoption of Emerging Sustainment Technologies – Phase II Complete
Adoption of Emerging Commercial Technologies Complete
Corrosion Detection Under Coatings Complete
Mobile pRFID System to Support Depot Maintenance – Phase II Complete
Air Force Energy and Water Resilience Programmatic Integration Complete
Air Force “Mission Assurance through Energy Assurance” Programmatic Integration Complete
Advancing Processes for Legacy Component Recycling and Re-Introduction During System Modernization During Maintenance, Repair and Overhaul – Phase III Complete
Improving Maintenance of Intelligent Robotic Systems Through Modular Designs Active
Mobile pRFID System to Support Depot Maintenance Complete
Automated Armory: Total Asset Visibility Evaluation and Demonstration Complete
Affordable Readiness and Improved Capability through Reclamation in lieu of Procurement (RILOP) Process Development, MK 122 Torpedo Demonstration – Phase IV Complete
The Refurbishment, Re-Engineering, and Testing for Sustainable Re-Introduction of Components into Legacy Systems Complete
Automated Armory: Total Asset Visibility Evaluation and Demonstration – Phase II Complete
The Refurbishment, Re-Engineering, and Testing for Sustainable Re-Introduction of Components into Legacy Systems – Phase II Complete
Enhancing Condenser Tube Cleaning through Innovative Technology – Phase II Active
Improving Readiness by Creating a Rapid Response Capability for System Sustainment and Support Operations Active
Advanced Braking and Suspension Systems to Improve Reliability and Reduce Maintenance Active
Improved Sustainment and Maintenance of Workload Tracking Tools – Phase II Active
Marine Propulsion Drivetrain Digital Twin to Support Maintenance & Sustainment Active
Modification to Manufacturing Demonstration Tool-Set for Maintenance & Sustainment Support – Phase III-A of the Integrated Digital Resource Network (IDRN) Complete
Modification to Mfg. Demonstration Tool-Set for Maintenance & Sustainment Support – Phase III for Integrated Digital Resource Network (IDRN) Complete
Manufacturing Demonstration Tool-Set for Maintenance & Sustainment Support for FRC Southeast and FRC Southwest – Phase II Complete
Consolidation of Adhesives and Sealants – Phase II Complete
Integration and Sustainment Strategy Complete
Industrial Business Reform Complete
Supply Chain Management of Real-Time Data Complete
Long-Term Tire Storage – Phase III Complete
Battery Cell Deactivation for Improved Safety Complete
Vehicle Health Management System (VHMS) – Phase II Complete
Improved Robustness of Crash Avoidance System Sensors to Reduce Maintenance and Repair Costs Complete
Using Data Analytics and Machine Learning to Improve Inventory Management Capabilities Complete
Improving Logistics, Maintenance, and Sustainment Planning of Wheeled Vehicles and Watercraft Complete
Leveraging Advanced Manufacturing to Redesign Towing and Tie-Down Kits for Improved Availability, Reduced Maintenance, and Increased Safety Complete
Maintenance Solutions for Modernized Flight Control Complex Assemblies Complete
Improving Medical Equipment Maintenance and Sustainment through Simulators and Trainers – Phase II Active
Improving Medical Equipment Maintenance and Sustainment through Simulators and Trainers Active
Improving Reliability of Utility Infrastructures for Resiliency Complete
3D Printing for Improved Maintenance and Sustainment of Shipyards Complete
Integrated Communications Systems for Improved Logistics Activity Active
Integration of Repair Data Complete
Voice-Directed Inspection Maintenance System (VIMS) – Phase II Complete
Voice Directed Maintenance & Inspection Complete
Operational Energy Training and Education – Phase II Complete
Integration of Operational Energy into Training and Education Complete
Advanced Thermoplastics Membranes for Water Filtration Complete
Lightweighting and Joining Adhesives for Maintenance Complete
Advanced Mobile Universal Electrical Tester (AMUET) for Maintenance and Sustainment – Phase IV Complete
Integrated Corrosion System – Phase II Complete
Development of C2RAM-Next; Transforming Resource Allocation Management – Phase II Complete
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • Last

NCMS Logo

The National Center for Manufacturing Sciences
3025 Boardwalk
Ann Arbor, MI 48108

Email: contact@ncms.org

Phone: (800) 222-6267
Fax: (734) 995-1150

About NCMS

  • About
  • Leadership
  • Strategic Initiatives
  • Capabilities
  • Careers

Programs

  • AMMP
  • CTMA
  • CyManII
  • Environmental Programs
Copyright © 2023 The National Center for Manufacturing Sciences - All rights reserved.
Privacy Policy | NCMS Event Registration Guidelines and Event Disclosure and Confidentiality Agreement |
Scroll