• ABOUT
  • CONTACT
Menu
  • Collaborations
    • AMMP

      AMMP Home
      About
      Resources
      Membership
      Contact

      CTMA

      CTMA Home
      About 
      News
      Opportunities
      Projects
      Partners
      Contact

      CyManII

      Overview

      Environmental Programs

      Home
      About
      Partners
      Contact

  • News
    • News
      CTMA Magazine
      CTMA Connector
      Technology Briefs
      Opportunities
      Project Announcements
      News Archive

      RECENT HEADLINES

      NCMS Chief Technology Officer Appointed to Navy’s Science and Technology Board

      US Army's Inaugural Contested Logistics Industry Week Scheduled for September

      First NCMS Technology Showcase at Tinker AFB Shines Spotlight on Innovative Solutions

      Accelerating Technology Transition: NCMS Expands its Impact

      CTMA Delivers Technology Transition Success Stories

  • Events
    • Upcoming Events

      09/26/2023 - 09/28/2023
      2023 NCMS Technology Showcase: Puget Sound Naval Shipyard & IMF

      12/18/2023 - 12/21/2023
      2023 DoD Maintenance Symposium

      01/16/2024 - 01/18/2024
      Save the Date: NCMS Technology Showcase: Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNS & IMF)

      View all events

  • Membership
    • NCMS Membership

      Membership Overview


Commercial Technologies for Maintenance Activities
Home | About | News | Opportunities | Events | Projects | Partners |  Contact

 

 

Project Title Status
Robotic Painting Optimization for Military Vehicles Complete
OptiCAM Complete
Enhanced Wiring Integrity System (EWIS) Complete
Damage and Wear Assessment Using Condition-Based Monitoring Complete
Retrograde Part Identification Using 2nd Generation Permanent Marking Techniques (Parts ID) Complete
Inspection and Repair Preparation Cell (IRPC) Complete
Integration of Laser Coating Removal Systems Complete
LAV Life-Cycle Logistics Support Tool Complete
Flat Wire Deposition for In-situ Repair Complete
Product Lifecycle Management (PLM) for Six Sigma Quality – Phase I Complete
RARE Parts through RM&R – Phase IV Complete
PLM for Six Sigma Product Quality (PLM4SS) Complete
HITHRU Aluminum/Titanium Part Production Deployment Complete
Technology Roadmapping for USMC Maintenance Depots Complete
ATE Synthetic Instrumentation Insertion – Phase II Complete
ATE Test Program Set Migration System Complete
Replacement for Hexavalent Chromium in Surface Finishing Processes Complete
Heat Transfer Classification for Production Tooling and Composite Repairs Complete
Automated Process & Inspection Guide (AP&IG) In-Process Mobile Paper Replacement Validation Solution (IMPRoVS) Complete
Kinetic Spray Metal Deposition Complete
Implementation of Innovative Hard Chromium Plating Tooling at Corpus Christi Army Depot – Phase I Complete
Smart Machine Pilot Project Complete
Static Event Detection Initiative (SED) Complete
Smart Machines Pilot Project – Phase II (SMP2P) Complete
Casting Knowledge Reuse-Based Cost Advisor Complete
Laser Coating Removal – Phase II Complete
High Performance 3D Scanning System Complete
LAV II Sense and Respond Complete
Portable Large Shape Inspection System Complete
Durable, Non-Skid Coating for Carriers Complete
Innovation in Hard Chrome Plating Tooling at North Island NADEP Complete
Assembly Design & Documentation (AD&D) – Phase I Complete
Legacy Lifecycle Management (LLM) Complete
Ultrasonic Consolidation of Titanium Alloys Complete
Integrating Sensors and Predictive Maintenance Systems with Performance Support Technology to Achieve Increased CH-53E Readiness and Reliability – Phase I & II Complete
Innovation in Hard Chrome Plating Tooling at CCAD – Phase II Complete
Centralized Fleet Automated Management System (CFAMS) Complete
Metal Finishing Development Program Complete
Volumetric Accuracy for Large Machine Tools (VALMT) Complete
Modernization of Nickel Electroplating at Depots Complete
Validation of Functional Trivalent Chrome Plating Process – Phase II Complete
Erosion/Corrosion Resistant Coatings for Gas Turbine Engine Compressor Systems Operating in both Sand and Maritime Environments Complete
Modernizing Technical Data Packages – Phase I Complete
Enhanced Wiring Integrity System (EWIS) – Phase II Complete
Sense & Respond, LAV III Complete
Improved Stealth and Lower Cost Operations for U.S. Navy Ships using High-Performance Cordage Deck Edge Netting (HPC DEN) Complete
Automated Intensifier Measurement System (AIMS) Complete
IUID Marking for Legacy Parts Complete
Corrosion Resistant Solid State Thin-Walled Component Joining for Maintenance and Repair Applications – Phase I & II Complete
Robotic Automated Coating Removal System (RACRS) – Phase I Complete
  • First
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • Last

NCMS Logo

The National Center for Manufacturing Sciences
3025 Boardwalk
Ann Arbor, MI 48108

Email: contact@ncms.org

Phone: (800) 222-6267
Fax: (734) 995-1150

About NCMS

  • About
  • Leadership
  • Strategic Initiatives
  • Capabilities
  • Careers

Programs

  • AMMP
  • CTMA
  • CyManII
  • Environmental Programs
Copyright © 2023 The National Center for Manufacturing Sciences - All rights reserved.
Privacy Policy | NCMS Event Registration Guidelines and Event Disclosure and Confidentiality Agreement |
Scroll